HYRT low-flow drip tapes (such as 0.35 L/h) can be laid over 300 meters per line, reducing the need for main pipes and valves and lowering overall costs. The exact length depends on flow rate, terrain, and pipe diameter, so hydraulic calculations are recommended for precise planning.