loading

Quality Management

Process Quality Control Management
Every product, from raw materials to finished goods, undergoes rigorous testing.
We firmly believe that only by integrating quality control throughout the entire production process can we ensure that every product delivered to our customers is consistent and reliable. From the arrival of raw materials to the shipment of finished goods, we have established multiple quality control checkpoints and strictly adhere to the ISO 9001 quality management system and the GB/T 19812 national standard.
Our Quality Control Philosophy
"Do not accept defects, do not create defects, do not pass on defects"—this is the principle that every production and quality control staff member at HYRT adheres to. We do not rely on final sampling inspections to screen products; instead, we follow these approaches:

Prevention-oriented: Control at the source to ensure raw materials and molds meet standards
Process control: Set inspection points at every stage to identify and correct issues promptly
Continuous improvement: Using inspection data to optimize processes and reduce defect rates

It is precisely this commitment to quality that has kept our finished product failure rate consistently below 0.3%, far lower than the industry average.
Quality Inspection Process
HYRT's quality control process covers the entire supply chain, from raw materials to finished products.
Incoming Raw Material Inspection (IQC)

Upon arrival at the factory, all raw materials must first undergo sampling inspection by the Quality Control Department. They may only be stored after passing inspection in accordance with GB/T 19812 and internal company standards. Non-conforming raw materials must be returned to the supplier and may not be used in production.

Inspection Items Include:

 Appearance: Particle uniformity, color, impurities

Physical Properties: Melt Flow Index, Density, Moisture Content

Mechanical Properties: Impact Strength, Tensile Strength

Special Properties: Anti-aging Agent Content (for formulations containing anti-aging additives)

First-Piece Inspection

The first finished product from each production batch must undergo a comprehensive inspection by quality control personnel after production begins. This ensures that the mold, equipment, and process parameters are correctly set to prevent batch defects.

Inspection Items:

Dimensional Accuracy: including outer diameter, inner diameter, wall thickness, and length

Functional Specifications: dripper flow rate, nozzle spray range, and valve sealing performance

Appearance: burrs, shrinkage, flash, color variation

HYRT Irrigation Equipment Manufacturer
In-Process Quality Control (IPQC)
During production, quality control personnel conduct random spot checks on work-in-progress every two hours.

Key Inspection Points:

Stability of critical dimensions

Whether equipment operating parameters are within standard ranges

Whether operators are following the work instructions

Whether labeling and status are clear (separate zones for conforming, pending, and non-conforming products)

HYRT Irrigation Equipment Manufacturer
100% Inspection / Sampling Inspection (FQC)

After production, depending on the product type and customer requirements, either a 100% inspection or a high-coverage sampling inspection is conducted.


Critical safety components/functional components, such as emitters, micro-sprinklers, and valves: 100% flow rate testing and leak testing.

Standard components: such as fittings and drip tape—inspected via sampling according to AQL standards, primarily checking appearance, dimensions, and packaging.

Outgoing Quality Control (OQC)
Before products are shipped, quality control personnel randomly select samples from the finished goods warehouse for a final inspection.

Inspection Items:

 Packaging integrity, including inner bag sealing and outer box labeling

Comparison with order specifications and customer samples to ensure product conformity

Verification of accompanying documents, including test reports, certificates of conformity, and instruction manuals

HYRT Irrigation Equipment Manufacturer
Key Quality Inspection Standards
HYRT's quality control system strictly adheres to authoritative domestic and international standards, ensuring the compliance and competitiveness of its products in global markets.
Standard Category Standard Number and Name Applicable Products
Quality Management System ISO9001:2015 Company-wide Quality Management
Environmental Management System ISO14001:2015 Production Environmental Management
Occupational Health and Safety ISO45001:2018 Employee Health and Safety
National Standard for Drip Irrigation Tape GB/T 19812.1-2017 Drip Irrigation Tape
National Standard for Drip Irrigation Tubing GB/T 19812.2-2017 Drip Irrigation Tubing
National Standard for Micro-sprinkler Tape GB/T 19812.3-2017 Micro-sprinkler Tape
Product Safety Certification CE (EU) Products Exported to Europe
Third-Party Testing English Report from Shandong Testing Center Customer-specified items
In addition, we have established internal standards tailored to specific customer requirements, such as:
Flow uniformity: ≥90% (exceeding the national standard of 85%)
Aging resistance test: After 1,000 hours of accelerated aging in a UV aging chamber, tensile strength retention rate ≥80%
Pressure resistance test: No leakage after maintaining pressure at 1.5 times the working pressure for 1 hour
Featured Testing Equipment
HYRT's Quality Control Center is equipped with a variety of specialized testing instruments to ensure that all metrics are quantifiable and traceable.
Raw Material Testing Equipment

Melt Flow Index Tester: Measures the flowability of PE raw materials to determine their suitability for injection molding or extrusion


Electronic Universal Tensile Testing Machine: Measures the tensile strength and elongation at break of raw materials


Impact Tester: Measures the impact resistance of raw materials


Moisture Analyzer: Measures the moisture content of raw materials (excessive moisture can cause bubbling and brittleness in the final product)

HYRT Irrigation Equipment Manufacturer
Process and Final Product Testing Equipment

 Laser Thickness Gauge: Non-contact measurement of drip tape/tube wall thickness, with an accuracy of 0.01 mm


Flow Uniformity Test Bench: Simultaneously tests multiple emitter/drip tape outlet holes and automatically calculates flow deviation


Pressure Test Bench: Performs hydrostatic and pneumatic leak tests on valves, filters, and fittings


Salt Spray Test Chamber: Simulates marine climates to test the corrosion resistance of metal and plastic components


UV Aging Test Chamber: Simulates solar radiation to test product aging resistance


Coordinate Measuring Machine: High-precision measurement of complex dimensions in injection-molded parts (e.g., threads, slots)

HYRT Irrigation Equipment Manufacturer
Packaging and Visual Inspection

 Digital calipers, thread gauges: Routine dimensional measurements


Color difference meter: Ensures color consistency of products, particularly for OEM custom products


Drop test machine: Simulates transportation conditions to test packaging impact resistance


All testing equipment is calibrated regularly, and calibration certificates are retained for reference.

Quality Traceability and Continuous Improvement

HYRT has established a comprehensive product quality traceability system. Every batch of finished products is assigned a unique batch number, which can be traced back to the production date, work team, machine, raw material batch, inspection records, process inspection data, and shipping destination. When a quality issue arises, we quickly identify the root cause and implement corrective and preventive actions to ensure that similar problems do not recur.

Our Commitment

<0.3% Defect Rate: The defect rate of finished products leaving the factory is controlled below 0.3%, far exceeding the industry average of 1–2%


100% Traceability: Every product can be traced back to its raw materials, production equipment, and time


Third-Party Verification: We can provide English test reports from authoritative institutions such as the Shandong Provincial Testing Center


Joint Customer Inspection: We welcome customers to send representatives or commission third parties to conduct on-site inspections at our factory, and we will fully cooperate throughout the process

HYRT Irrigation Equipment Manufacturer
Contact Us
Let' s Discuss Your Needs
Our water-saving experts will provide you with full assistance from quotation to delivery.
Write to Us
hyrtdrip@gmail.com
Support Center 24/7
0086-18963442366
Our Location
No. 2, Wuhua Street, Fengcheng Industrial Park, Laiwu District, Jinan City, jinan, Shandong, China
Shandong HYRT Water-saving Irrigation Co., Ltd.
One-stop professional irrigation system manufacturer
Contact Us
Tel: 0086-18963442366
Customer service
detect